The construction of the electromechanical installation project covers five divisions, and the content is complicated. Only when the preparatory work before construction is in place, the project can be carried out in an orderly manner. Let's take a look at the procedures that the construction unit has to do when entering the site in combination with the construction case.
The electromechanical installation and construction procedures should be determined according to the two aspects of the development direction determined by each unit project of the construction project and the construction process of each unit project.
1. Principles for determining construction procedures
As the project manager department of the general contractor, the following points should be considered when determining the construction procedures of the project in phases and batches: on the premise of ensuring the construction period, implement the construction in phases and batches, make overall arrangements for the construction of each unit, ensure the key points and take into account other , to ensure that the project is put into production on time.
For auxiliary projects with small amount of work, little difficulty, short period and no rush to use in construction projects, it can be considered to cooperate with the main production workshop project as a balanced construction interspersed. All works should be underground first, then above ground; deep and then shallow; arrangements should be made on the principle of trunk lines first and branches later, and details such as the impact of seasons on construction should be considered.
2. The general electromechanical installation and construction stages can be roughly divided into construction preparation stage, construction stage and delivery and completion acceptance stage.
1. Construction preparation stage: The construction preparation stage is precisely the stage in which the necessary conditions are created for the start of the unit project. Generally, the following conditions must be met: the construction permit has been processed; the construction drawings have been reviewed; the construction budget has been prepared; the construction organization design has been approved and disclosed; Construction and living needs; materials and engineering equipment have appropriate reserves and can enter the site one after another; construction machinery and equipment have entered the site and can ensure normal operation; the labor force plan has been implemented and necessary technical safety fire prevention education has been carried out, which can be transferred at any time Approaching the site; the main body of the civil engineering is completed, and the process of installing and coordinating the pre-buried and reserved pipelines and components of the civil engineering has been completed, and the conditions for delivery and installation have been reached.
2. Construction stage: The construction must be organized in accordance with the requirements of the construction organization design, construction plan, construction drawings and technical documents, and the construction must be organized according to the determined construction procedures, and gradually form the entire process from the peak installation period to the completion of linkage debugging and no-load trial operation. construction activities.
3. Delivery and completion acceptance stage: including civil construction, installation, decoration and decoration, after the completion of all the construction, the responsible party for the construction will accept the internal pre-acceptance. The construction unit organizes the design party, the supervisory party and the relevant construction party to carry out the acceptance inspection. After passing the inspection, it will go through the acceptance inspection procedures and related matters.