Home > Case > HVAC Engineering

The first phase project of the pilot area of Wuzhen Internet Industrial Park

Editor:浙江正合安装有限公司 │ Release Time:2021-09-13 


Located on the southeast side of Development Avenue, Tongxiang Economic Development Zone, west of Qinhuangmiaogang, it has 22 floors above ground and 1 floor underground, with a construction period of 60 days and a high-rise frame structure type. Our company participated in the construction of the shared hall of Building 1#3# and Building 7#8#. The installation of fresh air system, pipes and power cables in the HVAC system cost about 11.14 million yuan.