Weak current project of the original site expansion (Phase II) project of the First People's Hospital of Pinghu City

Editor:浙江正合安装有限公司 │ Release Time:2021-09-13 


Building scale: One medical building (1 floor underground, 5 floors above ground), construction area: 8682.43 square meters (including 1612.27 square meters underground); one comprehensive building (1 floor underground, 7 floors above ground), construction area of 11946.47 square meters meters (of which 883.98 square meters underground).


There are 12 intelligent subsystems in this project: 1. Integrated wiring system, 2 Information network system, 3 CATV system (incorporated into integrated wiring system), 4. Security system (intrusion alarm system, access control system, electronic inspection system) , monitoring system), 6. Cable TV system, 7. Public broadcasting system, 8. Electronic conference system, 9. Medical call intercom system, 10. Information guidance and release, queuing system, 11. Energy consumption monitoring system, 12 computer room works.